Alle ansehen

Bitte die englische Version als offizielle Version nehmenZurück

Europa
France(Français) Germany(Deutsch) Italy(Italia) Russian(русский) Poland(polski) Czech(Čeština) Luxembourg(Lëtzebuergesch) Netherlands(Nederland) Iceland(íslenska) Hungarian(Magyarország) Spain(español) Portugal(Português) Turkey(Türk dili) Bulgaria(Български език) Ukraine(Україна) Greece(Ελλάδα) Israel(עִבְרִית) Sweden(Svenska) Finland(Svenska) Finland(Suomi) Romania(românesc) Moldova(românesc) Slovakia(Slovenská) Denmark(Dansk) Slovenia(Slovenija) Slovenia(Hrvatska) Croatia(Hrvatska) Serbia(Hrvatska) Montenegro(Hrvatska) Bosnia and Herzegovina(Hrvatska) Lithuania(lietuvių) Spain(Português) Switzerland(Deutsch) United Kingdom(English)
Asien/Pazifik
Japan(日本語) Korea(한국의) Thailand(ภาษาไทย) Malaysia(Melayu) Singapore(Melayu) Vietnam(Tiếng Việt) Philippines(Pilipino)
Afrika, Indien und Naher Osten
United Arab Emirates(العربية) Iran(فارسی) Tajikistan(فارسی) India(हिंदी) Madagascar(malaɡasʲ)
Südamerika / Ozeanien
New Zealand(Maori) Brazil(Português) Angola(Português) Mozambique(Português)
Nordamerika
United States(English) Canada(English) Haiti(Ayiti) Mexico(español)
ZuhauseProdukteDevelopment Boards, Kits, ProgrammiererEvaluation und Demonstration Boards und KitsTPS59632Q1EVM-057
TPS59632Q1EVM-057 Image
Das Bild steht nur zum Referenz. Für detaillierte Produktinfos bitte die Produktdaten einsehen
EXPRESSOPTION
Zahlungsmethode

TPS59632Q1EVM-057 - Texas Instruments

Hersteller Artikelnummer
TPS59632Q1EVM-057
Hersteller
Texas Instruments
Allelco Artikelnummer
98D-TPS59632Q1EVM-057
Garantie
1 Jahr Allelco Garantie - Finden Sie mehr heraus
Teile Beschreibung
EVM FOR 3-PHASE 60-AMPERE AUTO V
Verpackung
Box
Datenblatt
-
Unsere Zertifizierung
vorrätig: 42511
  • Einzelpreis: $621.284
  • Zwischensumme: $0.00

Willst du einen besseren Preis?
Hinzufügen zu CART und Senden Sie jetzt RFQ , wir werden Sie sofort kontaktieren.

Anzahl Einzelpreis Zwischensumme Preis
1+ $621.284 $621.28
200+ $247.897 $49,579.40
500+ $239.613 $119,806.50
1000+ $235.52 $235,520.00
Steuer- und Lieferkosten sind im Preis nicht inbegriffen, detailliert findet man ihn auf der Sendungsseite
EXPRESSOPTION
Zahlungsmethode
Unsere Zertifizierung

Spezifikation

TPS59632Q1EVM-057 Tech -Spezifikationen
Texas Instruments - TPS59632Q1EVM-057 Technische Spezifikationen, Attribute, Parameter und Teile mit ähnlichen Spezifikationen wie Texas Instruments - TPS59632Q1EVM-057

Produkteigenschaften Eigenschaften  
Hersteller Texas Instruments  
Verwendetes IC / Teil TPS59632Q1  
Art Power Management  
Mitgelieferter Inhalt Board(s)  
Serie -  
Sekundärattribute I²C Interface  
Produkteigenschaften Eigenschaften  
Primärattribute -  
Paket Box  
Funktion Integrated Power Supply  
Eingebettet No  
Grundproduktnummer TPS59632  

Umwelt- und Exportklassifikationen

ATTRIBUT BESCHREIBUNG
RoHS Status Unzutreffend
Feuchtigkeitsempfindlichkeit (MSL) 1 (Unlimited)
ECCN EAR99
HTSUS 8473.30.1180

Bauteile mit ähnlicher Spezifikation

Die rechten drei Teile haben ähnliche Spezifikation wie Texas Instruments TPS59632Q1EVM-057.

Produkteigenschaften TPS59632Q1EVM-057 TPS59620RHAR TPS59620RHAT TPS59641RSLT
Artikelnummer TPS59632Q1EVM-057 TPS59620RHAR TPS59620RHAT TPS59641RSLT
Hersteller Texas Instruments Texas Instruments Texas Instruments Texas Instruments
Paket Box Tape & Reel (TR) - Tape & Reel (TR)
Eingebettet No - - -
Serie - D-CAP+™ - D-CAP+™
Mitgelieferter Inhalt Board(s) - - -
Grundproduktnummer TPS59632 TPS59620 - TPS59641
Sekundärattribute I²C Interface - - -
Funktion Integrated Power Supply - - -
Verwendetes IC / Teil TPS59632Q1 - - -
Art Power Management - - -
Primärattribute - - - -

Kundenrezensionen

Bewertung: 10 Artikel

  • Jess***Jones
    2026/04/17

    It offers good value for the price, and the specifications match the description. I’ve been using it for two days with no issues, and I’ll definitely buy it again if I need it in the future.

  • Mich***Smith
    2026/04/17

    Shipping was on time, the component pins are neatly aligned, and I tested 10 of them with a multimeter—all readings were within the specified range. Highly recommended.

  • Aman***arris
    2026/04/3

    It was great—the entire process, from placing the order to receiving the package, went very smoothly. The components were consistent, the price was fair, and I had a very pleasant shopping experience.

  • Mike***nch
    2026/04/3

    Better than expected! The resistance and capacitance readings were spot-on, and it passed the test on the first try. The service was reliable, and the packaging was thoughtful—I highly recommend it.

  • Daic***K.
    2026/03/23

    Very good. No issue after long time testing.

  • Kevi***.
    2026/03/17

    Fast switching and stable output. Very satisfied with this IC

  • Daou***hekebkeb
    2024/06/16

    I had a great experience purchasing items from Allelcoelec, I recommend

  • Uri ***al
    2024/06/19

    Good comunication,
    Transpnt regarding the process and price.

  • Yaqu***l Ali
    2024/06/19

    Providing reasonable prices, regular follow-up of orders, providing accurate and regular invoices, timely delivery of goods, excellent customer service and providing original goods and best quality materials.

  • Lea ***
    2024/06/19

    Morrey was very helpful and right on top of things!
    He replied quickly to my RFQ. He was very courteous and professional.

Schreiben Sie eine Bewertung

Ihre E -Mail -Adresse wird nicht veröffentlicht.

Lieferung

Lieferzeit

STACK-Artikel können innerhalb von 24 Stunden versendet werden.Einige Teile werden innerhalb von 1-2 Tagen ab dem Datum angeordnet, an dem alle Artikel in unserem Lagerhaus eintreffen.Und Allelco -Schiffe bestellen einmal am Tag gegen 17:00 Uhr, außer am Sonntag.Sobald die Ware versendet werden, hängt die geschätzte Lieferzeit von den Versandmethoden und dem Lieferziel ab.Die folgende Tabelle zeigt die logistische Zeit für einige Gemeinsame Länder.

Versandkosten

  1. Verwenden Sie Ihr Expresskonto für den Versand, wenn Sie einen haben.
  2. Verwenden Sie unser Konto für die Sendung.In der folgenden Tabelle finden Sie die ungefähren Gebühren.
(Unterschiedlicher Zeitrahmen / Länder / Paketgröße hat einen unterschiedlichen Preis.)

Versandart

  1. Globale gemeinsame Versand von DHL / UPS / FEDEX / TNT / EMS / SF, die wir unterstützen.
  2. Andere Versandmethoden, bitte setzen Sie sich mit Ihrem Kundenmanager in Verbindung.

Logistische Zeitreferenz für Gemeinsame Länder
Region Land Logistische Zeit (Tag)
Amerika Vereinigte Staaten 5
Brasilien 7
Europa Deutschland 5
Großbritannien 4
Italien 5
Ozeanien Australien 6
Neuseeland 5
Asien Indien 4
Japan 4
Naher Osten Israel 6
DHL & FedEx -Versandkosten Referenz
Versandkosten (KG) Referenz DHL (USD $)
0.00kg-1.00kg USD$30.00 - USD$60.00
1.00kg-2.00kg USD$40.00 - USD$80.00
2.00kg-3.00kg USD$50.00 - USD$100.00
Notiz:
Die obige Tabelle dient nur als Referenz.Möglicherweise gibt es einige Datenverzerrungen für die unkontrollierbaren Faktoren.
Kontaktieren Sie uns, wenn Sie Fragen haben.

mögliche Zahlungsmitteln

Als Zahlungsmittel stehen folgende Mitteln zur Wahl: T/T, Banküberweisung, Westunion-Überweisung, Kreditkarte, PayPal.

Ihr treuer Lieferkettenpartner -

Bei Fragen setzen Sie sich bitte mit uns in Verbindung.

  1. Telefon
    +00852 9146 4856

Zertifikate und Mitgliedschaft

Mehr sehen
TPS59632Q1EVM-057 Image

TPS59632Q1EVM-057

Texas Instruments
98D-TPS59632Q1EVM-057

Willst du einen besseren Preis? Hinzufügen zu CART und Senden Sie jetzt RFQ , wir werden Sie sofort kontaktieren.

0 RFQ
Einkaufswagen (0 Items)
Es ist leer.
Vergleichen Sie die Liste (0 Items)
Es ist leer.
Rückmeldung

Ihr Feedback ist wichtig!Bei Allelco schätzen wir die Benutzererfahrung und bemühen uns, sie ständig zu verbessern.
Bitte teilen Sie Ihre Kommentare über unser Feedback -Formular mit und wir werden umgehend antworten.
Vielen Dank für die Wahl von Allelco.

Thema
Email
Bemerkung/Erläuterung
Verifizierungscode
Ziehen oder klicken, um die Datei hochzuladen
Datei hochladen
Typen: .xls, .xlsx, .doc, .docx, .jpg, .png und .pdf.
MAX -Dateigröße: 10 MB